  Journal Article   Journal Article
 

ID171358
Title ProperNuclear decommissioning after the German nuclear phase-out an integrated view on new regulations and nuclear logistics
LanguageENG
AuthorScherwath, Tim ;  Wealer, Ben ;  Mendelevitch, Roman
Summary / Abstract (Note)With Germany's nuclear phase-out, 23 reactors need to be dismantled in the near future. Initiated by the difficult financial situation of affected utilities in 2014, a major discourse on ensuring financial liability led to a redistribution of liabilities and finances, with the utilities remaining in charge of dismantling, while liability for interim and final storage now transferred to the public. This paper assesses whether the new regulation is ultimately likely to be to the benefit of the public. It introduces a two-stage stochastic optimization framework encompassing the different dismantling phases, resulting waste flows and storage levels of low- and intermediate-level waste (LLW and ILW) as well as the associated costs. Results show that storage risk – proclaimed as a major barrier to efficient decommissioning – is not a major driver for the optimal decommissioning schedule. However, a delay of ten years might increase interim storage costs now borne by the public by over 20%. Lacking experience and handling capacity of the industry could significantly shrink the buffer currently included in utility funds in order to deal with dismantling uncertainties. Our analysis reveals the storage gate as the new crucial interface between utilities and the public storage provider.
`In' analytical NoteEnergy Policy Vol.137; Feb 2020: p.111125
Journal SourceEnergy Policy 2020-02
Key WordsRegulation ;  Nuclear Decommissioning ;  Nuclear Dismantling ;  Financial Liability ;  Nuclear Logistics ;  Stochastic Modeling