Item Details
Skip Navigation Links
   ActiveUsers:369Hits:19963318Skip Navigation Links
Show My Basket
Contact Us
IDSA Web Site
Ask Us
Today's News
HelpExpand Help
Advanced search

In Basket
  Journal Article   Journal Article
 

ID090098
Title ProperWind-PV-battery hybrid power system at Sitakunda in Bangladesh
LanguageENG
AuthorNandi, Sanjoy Kumar ;  Ghosh, Himangshu Ranjan
Publication2009.
Summary / Abstract (Note)The measured wind data of Local Government Engineering Department (LGED) for 2006 at 30 m height shows a good prospect for wind energy extraction at the site. For a few months and hours the speed is below the cut in speeds of the available turbines in the market. The predicted solar radiation data from directly related measured cloud cover and sunshine duration data of Bangladesh Meteorological Department (BMD) for 1992-2003 indicates that a reliable power system can be developed over the year if the solar energy technology is merged with the wind energy technologies for this site. This research work has studied on optimization of a wind-photovoltaic-battery hybrid system and its performance for a typical community load. The assessment shows that least cost of energy (COE) is about USD 0.363/kWh for a community using 169 kWh/day with 61 kW peak and having minimum amount of access or unused energy. Moreover, compared to the existing fossil fuel-based electricity supply, such an environment friendly system can mitigate about 25 t CO2/yr. The analysis also indicates that wind-PV-battery is economically viable as a replacement for conventional grid energy supply for a community at a minimum distance of about 17 km from grid.
`In' analytical NoteEnergy Policy Vol. 37, No. 9; Sep 2009: p.3659-3664
Journal SourceEnergy Policy Vol. 37, No. 9; Sep 2009: p.3659-3664
Key WordsSolar Energy ;  Wind Energy ;  Green House Gas ;  Bangladesh ;  Energy