Item Details
Skip Navigation Links
   ActiveUsers:349Hits:19957374Skip Navigation Links
Show My Basket
Contact Us
IDSA Web Site
Ask Us
Today's News
HelpExpand Help
Advanced search

In Basket
  Journal Article   Journal Article
 

ID109710
Title ProperRisk assessment of river-type hydropower plants using fuzzy logic approach
LanguageENG
AuthorKucukali, Serhat
Publication2011.
Summary / Abstract (Note)In this paper, a fuzzy rating tool was developed for river-type hydropower plant projects, and risk assessment and expert judgments were utilized instead of probabilistic reasoning. The methodology is a multi-criteria decision analysis, which provides a flexible and easily understood way to analyze project risks. The external risks, which are partly under the control of companies, were considered in the model. A total of eleven classes of risk factors were determined based on the expert interviews, field studies and literature review as follows: site geology, land use, environmental issues, grid connection, social acceptance, macroeconomic, natural hazards, change of laws and regulations, terrorism, access to infrastructure and revenue. The relative importance of risk factors was determined from the survey results. The survey was conducted with the experts that have experience in the construction of river-type hydropower schemes. The survey results revealed that the site geology and environmental issues were considered as the most important risks. The new risk assessment method enabled a Risk Index (R) value to be calculated, establishing a 4-grade evaluation system. The proposed risk analysis will give investors a more rational basis to make decisions and it can prevent cost and schedule overruns.
`In' analytical NoteEnergy Policy Vol. 39, No.10; Oct 2011: p.6683-6688
Journal SourceEnergy Policy Vol. 39, No.10; Oct 2011: p.6683-6688
Key WordsHydropower ;  Risk Analysis ;  Fuzzy Logic