Item Details
Skip Navigation Links
   ActiveUsers:658Hits:20377382Skip Navigation Links
Show My Basket
Contact Us
IDSA Web Site
Ask Us
Today's News
HelpExpand Help
Advanced search

In Basket
  Journal Article   Journal Article
 

ID122739
Title ProperFirst results of incentives policy on grid interconnected photovoltaic systems development in Greece
LanguageENG
AuthorTsilingiridis, G ;  Ikonomopoulos, A
Publication2013.
Summary / Abstract (Note)The present study provides insights into how the national legislation affected the development of connected to the grid Photovoltaic (PV) systems in Greece from January 2007 to June 2012. It analyses the evolution of PV systems installed capacity in Greece, compared to the targets set, as well as the PV electricity production and CO2 emissions reduction. Moreover the geographical and the size distribution of installed capacity are examined. Up to June 2012, more than 820 MWp had been installed, covering 55% of the 2014 national PV target capacity of 1500 MWp. The majority of installed and licensed PV systems is in the class of 20-150 kWp, while the share of PV systems larger than 150 kWp is increasing steadily. The majority of installed capacity is located in southern Greece regions, where the solar potential is higher, with Peloponnesus having 15.4% of the total. The total licensed PV capacity, which is more than 2.400 MWp exceeding not only the national 2014 target but also the 2020 target of 2200 MWp for PV plants, together with the accelerated construction rate, which during 2012 is 49 MWp per month, allow the save prediction that the 2014 target will be overcome.
`In' analytical NoteEnergy Policy Vol.58; Jul 2013: p.303-311
Journal SourceEnergy Policy Vol.58; Jul 2013: p.303-311
Key WordsRES ;  Green Electricity ;  Energy Legislation