Item Details
Skip Navigation Links
   ActiveUsers:386Hits:19929910Skip Navigation Links
Show My Basket
Contact Us
IDSA Web Site
Ask Us
Today's News
HelpExpand Help
Advanced search

In Basket
  Journal Article   Journal Article
 

ID150007
Title ProperShould we build wind farms close to load or invest in transmission to access better wind resources in remote areas? A case study in the MISO region
LanguageENG
AuthorWiser, Ryan ;  Jaramillo, Paulina ;  Lamy, Julian V ;  Azevedo, Inês L.
Summary / Abstract (Note)Wind speeds in remote areas are sometimes very high, but transmission costs to access these locations can be prohibitive. We present a conceptual model to estimate the economics of accessing high quality wind resources in remote areas to comply with renewable energy policy targets, and apply the model to the Midwestern grid (MISO) as a case study. We assess the goal of providing 40 TWh of new wind generation while minimizing costs, and include temporal aspects of wind power (variability costs and correlation to market prices) as well as total wind power produced from different farms. We find that building wind farms in North/South Dakota (windiest states) compared to Illinois (less windy, but close to load) would only be economical if the incremental transmission costs to access them were below $360/kW of wind capacity (break-even value). Historically, the incremental transmission costs for wind development in North/South Dakota compared to in Illinois are about twice this value. However, the break-even incremental transmission cost for wind farms in Minnesota/Iowa (also windy states) is $250/kW, which is consistent with historical costs. We conclude that wind development in Minnesota/Iowa is likely more economical to meet MISO renewable targets compared to North/South Dakota or Illinois.
`In' analytical NoteEnergy Policy Vol. 96, No.96; Sep 2016: p. 341–350
Journal SourceEnergy Policy 2016-09 96, 96
Key WordsWind Power ;  Transmission ;  Variability ;  Decision Making Under Uncertainty