Query Result Set
Skip Navigation Links
   ActiveUsers:397Hits:20862564Skip Navigation Links
Show My Basket
Contact Us
IDSA Web Site
Ask Us
Today's News
HelpExpand Help
Advanced search

  Hide Options
Sort Order Items / Page
GEOTHERMAL POWER GENERATION (2) answer(s).
 
SrlItem
1
ID:   125618


Determining barriers to developing geothermal power generation : societal acceptance by stakeholders involved in hot springs / Kubota, Hiromi; Hondo, Hiroki; Hienuki, Shunichi; Kaieda, Hideshi   Journal Article
Kubota, Hiromi Journal Article
0 Rating(s) & 0 Review(s)
Publication 2013.
Summary/Abstract After many years of stagnant growth in geothermal power generation, development plans for new geothermal plants have recently emerged throughout Japan. Through a literature review, we investigated the relationships between the principal barriers to geothermal development and we thereby analyzed the deciding factors in the future success of such enterprises. The results show that the societal acceptance of geothermal power by local stakeholders is the fundamental barrier as it affects almost all other barriers, such as financial, technical, and political risks. Thus, we conducted semi-structured interviews with 26 stakeholders including developers, hot spring inn managers, and local government officials. Some hot spring inn managers and local government officials noted that they have always been strongly concerned about the adverse effects of geothermal power generation on hot springs; their opposition has delayed decision-making by local governments regarding drilling permits, prolonged lead times, and caused other difficulties. A key reason for opposition was identified as uncertainty about the reversibility and predictability of the adverse effects on hot springs and other underground structures by geothermal power production and reinjection of hot water from reservoirs. Therefore, we discuss and recommend options for improving the risk management of hot springs near geothermal power plants.
        Export Export
2
ID:   090047


Efficiency improvement for geothermal power generation to meet / Sohel, M. Imroz; Sellier, Mathieu; Brackney, Larry J; Krumdieck, Susan   Journal Article
Krumdieck, Susan Journal Article
0 Rating(s) & 0 Review(s)
Publication 2009.
Summary/Abstract Geothermal power is an important part of New Zealand's renewable electricity supply due to its attractive cost and reliability. Modular type binary cycle plants have been imported and installed in various geothermal fields in New Zealand, with plans for further expansion. Power output of these plants deteriorates in the summer because plant efficiency depends directly on the geothermal resource and the ambient temperature. As these plants normally use air-cooled condensers, incorporating a water-augmented air-cooled system could improve the power output in summer thereby matching the peak air-conditioning demand. In this work, power generation for the Rotokawa plant was characterized using a similar plant performance and local weather. The improved performance was modelled for retrofit with a wet-cooling system. Maximum generation increase on the hottest day could be 6.8%. The average gain in power over the summer, November-February, was 1.5%, and the average gain for the whole year was 1%. With current binary unit generation capacity at the Rotokawa plant of 35 MW, investment in a water-augmented air-cooled system could provide 2 MW of peak generation on the hottest days. This investment in efficiency is found to compare favourably to other supply options such as solar PV, wind or gas.
        Export Export