RAINERI, RICARDO (2) answer(s).
 
SrlItem
1
ID:   093468


Asset life and pricing the use of electricity transmission infr / Raineri, Ricardo   Journal Article
Raineri, Ricardo Journal Article
0 Rating(s) & 0 Review(s)
Publication 2010.
Summary/Abstract Beyond the different approaches to set regulated prices for the use of infrastructure, a key parameter to determine regulated tariffs is the concept of asset life and how it changes with changes in the economic and regulatory context, which determines the optimal infrastructure investment and replacement policies. In this paper we look at the effects that changes in demand, the presence of substitutes and complements, the regulatory framework - both a pro or an anticompetitive framework - , scale economies, and the investment planning horizon, have on the economic service life of an asset and the tariffs for its use. We find that as the electric industry becomes more competitive, a negative effect on the economic service life of electric electricity transmission should be expected. Also, numerical experiments illustrate an inverse relation between scale economies on investment and the ESL of electricity transmission infrastructure. Further, we look at the biases on optimal investment that happen when optimal plans do not observe the life cycle of the investments and the ESL of the equipment, as well as the inconsistency and biases on optimal investment and replacement policies that might result when the Social Planner optimal investment plan lacks of a long-term commitment.
        Export Export
2
ID:   099233


Efficient capacity investment and joint production agreements i: the HidroAysen joint venture project / Raineri, Ricardo; Contreras, Gonzalo   Journal Article
Raineri, Ricardo Journal Article
0 Rating(s) & 0 Review(s)
Publication 2010.
Summary/Abstract We develop a model for a power market with the characteristics of the Chilean power supply industry, which is an integrated system with a system operator (SO) with a vast authority to define the dispatch of the system. We evaluate whether a large joint power generator project made up by the two largest power generators is an anti-competitive project. Considering four investment technologies for power generation, namely, hydro, coal, diesel, and an advantageous hydro technology which can only be built in a large scale (HidroAysén) for the joint venture case, we use an oligopolistic Cournot model and a Benevolent Social Planner, both calibrated to the Chilean power industry, in order to assess the efficiency of alternative investment strategies and conditions whether the HidroAysén joint venture project can be barred to be judged as anti-competitive. Results suggest that the joint venture is an efficient investment and there is a pro-competitive behaviour on the part of the two power generators, and that there are benefit to consumers, who should expect non-increasing energy prices as a result of the advantageous hydrotechnology.
        Export Export