GRID PENETRATION (3) answer(s).
 
SrlItem
1
ID:   098563


Effects on grid matching and ramping requirements, of single an / Solomon, A A; Faiman, D; Meron, G   Journal Article
Solomon, A A Journal Article
0 Rating(s) & 0 Review(s)
Publication 2010.
Summary/Abstract In this second paper, which studies the hourly generation data from the Israel Electric Corporation for the year 2006, with a view to adding very large-scale photovoltaic power (VLS-PV) plants, three major extensions are made to the results reported in our first paper. In the first extension, PV system simulations are extended to include the cases of 1- and 2-axis sun-tracking, and 2-axis concentrator photovoltaic (CPV) technologies. Secondly, the effect of distributing VLS-PV plants among 8 Negev locations, for which hourly metrological data exist, is studied. Thirdly, in addition to studying the effect of VLS-PV on grid penetration, the present paper studies its effect on grid ramping requirements. The principal results are as follows: (i) sun-tracking improves grid matching at high but not low levels of grid flexibility; (ii) geographical distribution has little effect on grid penetration; (iii) VLS-PV significantly increases grid ramping requirements, particularly for CPV systems, but not beyond existing ramping capabilities; (iv) geographical distribution considerably ameliorates this effect.
        Export Export
2
ID:   099317


Grid matching of large-scale wind energy conversion systems, al: an Israeli case study / Solomon, A A; Faiman, D; Meron, G   Journal Article
Solomon, A A Journal Article
0 Rating(s) & 0 Review(s)
Publication 2010.
Summary/Abstract This paper presents a grid matching analysis of wind energy conversion systems (WECSs) and photovoltaic (PV)-WECS hybrid systems. The study was carried out using hourly load data of the Israel Electric Corporation (IEC) for the year 2006 and the corresponding simulated hourly performance of large PV and WECS plants in the Negev Desert. Our major objective was to compare the grid-matching capabilities of wind with those of our previously published PV results, and to assess the extent to which the combined employment of WECS and PV can improve the grid matching capability of either technology when used on its own. We find that, due to the differences in diurnal and seasonal output profiles of WECS and PV, their tandem employment significantly improves grid penetration compared to their use individually.
Key Words Grid Penetration  PV  WECS 
        Export Export
3
ID:   098609


Properties and uses of storage for enhancing the grid penetrati / Solomon, A A; Faiman, D; Meron, G   Journal Article
Solomon, A A Journal Article
0 Rating(s) & 0 Review(s)
Publication 2010.
Summary/Abstract In this third paper, which studies the hourly generation data for the year 2006 from the Israel Electric Corporation, with a view to incorporating very large photovoltaic (PV) power plants, we address the question: What properties should storage have in order to enhance the grid penetration of large PV systems in an efficient and substantial manner? We first impose the constraint that no PV energy losses are permitted other than those due to storage inefficiency. This constraint leads to powerful linkages between the energy capacity and power capacity of storage, and PV system size, and their combined effect on grid penetration. Various strategies are then examined for enhancing grid penetration, based upon this newfound knowledge. Specific strategies examined include PV energy dumping and baseload rescheduling both on a seasonal basis and shorter time periods. We found, inter alia, that at high grid flexibilities (in the range ff=0.8-1), PV grid penetration levels could be possible in the range 60-90% of annual requirements. Moreover, with appropriately designed storage and accurate forecasting, a future grid could be operated at ff=1.