BUIJS, PATRIK (1) answer(s).
 
SrlItem
1
ID:   103487


Transmission investment problems in Europe: going beyond standard solutions / Buijs, Patrik; Bekaert, David; Cole, Stijn; Hertem, Dirk Van   Journal Article
Buijs, Patrik Journal Article
0 Rating(s) & 0 Review(s)
Publication 2011.
Summary/Abstract The European transmission grid is facing an investment challenge. There is a strong call for more transmission capacity. At the same time, the investment climate is fierce and troubled by public opposition, a complex regulatory framework, etc. Many transmission capacity expansion projects are delayed or canceled. In this paper different technology options suitable for increasing transmission capacity are discussed. The aim is to provide policy-makers with information on technologies without going too much into technical details. The focus is on opportunities and limitations to implement various technological alternatives in practice, including technical solutions that go beyond constructing new connection lines. The criteria used in this technology assessment are based on the obstacles reported in the European Priority Interconnection Plan. This ensures a realistic approach based on problems encountered in real projects. Although AC overhead lines (OHL) will remain the standard solution for grid expansion, it is argued that different technology options can overcome many obstacles that OHL face. Additionally, it is illustrated that the higher investment costs for some solutions can be offset with an increased benefit, e.g. by accomplishing investments with smaller delays due to fewer obstacles encountered.