Query Result Set
Skip Navigation Links
   ActiveUsers:454Hits:20748533Skip Navigation Links
Show My Basket
Contact Us
IDSA Web Site
Ask Us
Today's News
HelpExpand Help
Advanced search

  Hide Options
Sort Order Items / Page
ANTICIPATORY TRANSMISSION PLANNING (1) answer(s).
 
SrlItem
1
ID:   191222


Overbuilding transmission: a case study and policy analysis of the Indian power sector / Athawale, Rasika   Journal Article
Athawale, Rasika Journal Article
0 Rating(s) & 0 Review(s)
Summary/Abstract Policies to substantially increase the amount of renewable energy produced and electrify much of the transportation and industrial sectors to achieve greenhouse gas reduction goals envision an extensive expansion of the transmission system. One set of proposals calls for anticipatory transmission planning, namely, building transmission to regions with the potential to develop renewable energy resources before their actual development. This paper presents a case study of transmission expansion planning in India. Our study finds that it is possible to overbuild the transmission system even in a country that is rapidly developing thermal and renewable resources and has sizeable electricity load growth. Anticipatory transmission planning, high guaranteed returns and weak governance can result in transmission overbuilding. This cautionary finding motivates several recommended public policy reforms to reduce future overbuilds, while supporting economically efficient and environmentally sound transmission development.
        Export Export